Category Archives: Phase II

Historic Solar Prices till May 2017, now at Rs. 2.44 per KWh

Image | Posted on by | Tagged , , , , , , , , | 1 Comment

Result of tendering for Selection of Developers for 400 MW Solar PV Projects under Part-B (Open) in Ananthapuramu Solar Park, AP under JNNSM Ph-II, Batch- III

Result of tendering for Selection of Developers for 400 MW Solar PV Projects under Part-B (Open) in Ananthapuramu Solar Park, AP under JNNSM Ph-II, Batch- III (RfS No. SECI/JNNSM/P-2/B-3/RfS/AP/122015 dated 02.01.2016) After Financial Bid Opening After e-Reverse Auction (held on … Continue reading

Posted in Andhra Pradesh, BATCH III, India, JNNSM, Phase II, Solar | Tagged , , , , , , , , , | Leave a comment

Approval of Guidelines for implementation of Scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission

Click here for the entire document  

Posted in Batch 4, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Ministry of Finance, MNRE, Power Generation, Renewables, Solar, Subsidy, VGF | Tagged , , , , , ,

Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM

The Draft Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding under Batch-IV of Phase-II of the JNNSM. In this regard the views / comments are requested from … Continue reading

Posted in Batch 4, Government, India, MNRE, Power Generation, PV, Solar Parks, VGF | Tagged , , , , , ,

The WTO Just Ruled Against India’s Booming Solar Program

Cartoon by Courtenay Lewis On the heels of the recent global summit in Paris to tackle climate disruption, the World Trade Organization (WTO) has ruled against an important piece of the climate solution puzzle: India’s ambitious program to create homegrown … Continue reading

Posted in Batch I, Batch II, Government, India, JNNSM, MNRE, Phase I, Phase II, PV, Renewables, Rooftop, Solar, Solar Policy, Tranche I, USA, WTO | Tagged , , , , , , , , , ,

Solar tariff trend in India from 2010-2016

Trend of Solar Tariff Previous bid results     Year Capacity on Offer (MW)   Highest Bid (Rs./KWh)   Lowest (Rs./KWh)   Weighted Avg. Price (Rs./KWh) NSM Batch 1 Dec’10 150 12.76 10.95 12.16 NSM Batch2 Dec’11 350 9.39 7.49 … Continue reading

Posted in Batch I, Batch II, Government, JNNSM, Phase I, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks, Tranche I | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Implementation of scheme for setting up over 2,000 MW of Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phase II of the JNNSM. 

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has given its approval for setting up of over 2,000 MW of Grid-Connected Solar PV Power Projects on Build, Own and Operate basis by Solar Power … Continue reading

Posted in Batch III, Crystalline, Government, Grid Interactive Distributed Solar Energy Systems, India, JNNSM, Ministry of Finance, Ministry of Power, MNRE, News, NTPC, NVVN, Phase II, Power Generation, Prime Minister, PV, Renewables, Solar, Solar Parks, Solar Policy, Thin Film, VGF | Tagged , , , , , , , , ,