Tag Archives: Solar Park

Solar power tariff continues free fall; hits new low of Rs 2.62 a unit

Phelan Energy Group and Avaada Power Private Limited have bagged 50 MW and 100 MW respectively at Rs 2.62 per unit while SBG Cleantech – a joint venture between SoftBank, Bharti Enterprises and Foxconn has bagged 100 MW at Rs … Continue reading

Posted in Government, India, PV, Rajasthan, Renewables, Solar Parks, Solar Policy, Solar PV | Tagged , , , , , , , , , , , , | Leave a comment

Tender Results of NTPC 420 MW Rajasthan Solar Park Bid

Tender Results : NTPC 420 MW Rajasthan Solar Park Bid Results Sr. No. Bidder’s Name Quoted Value Loaded Value Allotted Capacity (MW) 1 Fortum Finnsurya Energy Pvt Ltd 4.34 4.34 70 2 Rising Sun Energy Pvt Ltd 4.35 4.35 140 3 … Continue reading

Posted in Government, India, NTPC, Power Generation, PV, Solar Parks | Tagged , , , , , , , , , , , , , ,

Final Draft Guidelines for Selection of 3000 MW Grid – Connected Solar PV Power Projects under Batch-II Tranche-I “State Specific Bundling Scheme”

Final-draft-3000-MW-Tranche-1-Draft-Guidelines-State-Specific-Bundling-Scheme-2015_29012015 Phase-II, Batch-II, Tranche-I : State Specific Bundling Scheme These guidelines are for 3000 MW. MNRE will indicate the total quantity for various States based on response received from the States. NVVN may then procure that quantity through one or … Continue reading

Posted in Batch II, Climate Change, Government, Grid Connected, India, JNNSM, MNRE, Phase II, Power Generation, Renewable Purchase Obligation, Renewables, Solar, Solar Policy, Subsidy, Tranche I | Tagged , , , , , , , , , , , , , , , , , ,

Draft Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under Batch-II Tranche-I State Specific Scheme

Draft Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under Batch-II Tranche-I State Specific Scheme Government of India  Ministry of New and Renewable Energy – October 2014 The 1000 MW Bundling Scheme introduced under NSM Phase-I has been … Continue reading

Posted in Batch II, Commercial, Grid Connected, India, JNNSM, MNRE, Phase II, Power Generation, PV, Renewables, Solar, Solar Parks | Tagged , , , , , , , , , , , , , , , , | Leave a comment

Draft Scheme for Development of 20GW Solar Parks and Ultra Mega Solar power projects – Circulation for Comments Sept 2014

MNRE through this scheme plans setting up 25 solar parks, each with a capacity of 500 to 1000 MW; thereby targeting around 20000 MW of solar power installed capacity. These solar parks will be put in place in a span … Continue reading

Posted in India, MNRE, Power Generation, PV, Renewables, Solar, Subsidy, Transmission and Distribution | Tagged , , , , , , , , ,

Chhattisgarh Grid Based Solar Policy 2012 – 2017

Chahattisgarh_Solar_Policy_2012_2017 Chhattisgarh is the latest entrant into the solar club with the launch of its solar policy with provisions extending upto 2017. The target upto the year 2017 is between 500-1000MW of Solar Grid Power via Captive, Grid, Solar Parks, … Continue reading

Posted in PV, Renewables, Rural Lighting | Tagged , , , , , , , , , , , | 1 Comment

MP govt approves new solar energy policy, four solar energy parks each generating 200 MW of power will be set up in the state under public-private partnership

  Madhya Pradesh Government today approved its new solar energy policy, under which, four solar energy parks each generating 200 MW of power will be set up in the state under public-private partnership. The Solar Energy Policy-2012 was approved by … Continue reading

Posted in News, Solar | Tagged , , , , , , , , , , | 2 Comments